Home / Loan programs / Construction loans
Ground-up construction loans in San Jose
Financing to build from the ground up, lot included: new homes, ADUs, SB 9 lot-split homes, duplexes, infill rebuilds and small apartment buildings. Experienced builders can borrow up to 90% of the total project cost.
Construction loan terms
| Experienced builders | up to 90% of cost |
| Standard | up to 85% of cost |
| Limit on finished value | 70 to 75% |
| Lot cost financed | up to 70% |
| First-time builders | programs available |
| Smallest loan | $75,000 |
Builders with fewer recent projects, and smaller markets, are usually limited to 80% of cost.
Two limits decide the loan
Loan-to-cost measures the loan against what you spend on the lot and the build. Loan-to-value measures it against what the finished property will be worth. A construction loan has to fit inside both.
- The lot: up to 70% of what you paid can be financed.
- The whole project: normally up to 85% of cost.
- Experienced builders in major markets: up to 90% of cost.
- Less active builders and smaller markets: usually up to 80% of cost.
- Always: no more than 70 to 75% of the finished value.
Example
| Infill lot | $120,000 |
| Construction budget | $380,000 |
| Total cost | $500,000 |
| Finished value | $720,000 |
| 85% of cost | $425,000 |
| 90% of cost, experienced builder | $450,000 |
| 75% of finished value, the ceiling | $540,000 |
Who qualifies
Your record sets your leverage. Builders with completed projects get the most. First-time builders are not shut out: we have programs for them too.
Building in San Jose
- Seismic and fire codes. California’s building code sets seismic design for every new home, and in high fire hazard zones new homes need ignition-resistant construction and defensible space. That affects the design and the cost.
- Soil and foundations. Hillside lots and expansive soils usually need a soil report and an engineered foundation.
- Permits. Planning, Building and Code Enforcement reviews San Jose projects, and each of the county’s other cities runs its own office. Plan the schedule, and the loan term, around a realistic permit date.
- Zoning and ADUs. California law lets you add an accessory dwelling unit (ADU) and a junior ADU to most single-family lots, and SB 9 lets many owners split a lot or build a second home on it. San Jose offers preapproved ADU plans, and in 2024 it became the first city in the state to let owners sell an ADU separately as a condominium under AB 1033. Check the zoning and the lot before you buy or plan an addition.
- Build-to-rent. New houses and ADUs built to hold as rentals are common across the region. When the house is finished and leased, a DSCR loan can take out the construction loan.
- Historic districts. San Jose has historic districts and conservation areas such as Hensley, Naglee Park and Palm Haven. Exterior work, additions and demolitions on a historic property need review by city historic staff or the Historic Landmarks Commission as well as a building permit.
From construction loan to rental loan
Many investors build to keep. When the property is finished and leased, a DSCR rental loan pays off the construction loan and replaces it with long-term debt.
Finishing a stalled build
A construction completion loan lends against the project as it stands today and adds what is needed to finish it.
Documents we ask for
- Loan application and personal financial statement
- A line-item construction budget with a clear scope of work. Draws are paid against it
- Plans, drawings, soil report if you have one, and permit status
- Your general contractor’s details, insurance and recent completed projects
- Your own projects from the last 2 years, with settlement statements
- Two months of bank statements showing reserves
- Insurance and title contacts
The full list is in our hard money loan document checklist.
Construction loans: common questions
Normally up to 85% of the total project cost, and up to 90% for experienced builders in major markets. The loan must also stay within 70 to 75% of the finished value.
Yes. Up to 70% of the lot cost can be financed, as long as the total loan stays inside the loan-to-cost limit.
Yes. Build with a construction loan, then refinance into a DSCR rental loan once the home is leased.
Yes, we have first-time builder programs. Leverage rises with a record of completed projects.
Yes. A construction completion loan is based on the current as-is value plus the cost to finish.
Have a lot and a set of plans?
Send the address, the price and what you plan to do with the property. We will reply with the leverage and pricing that fit your deal.